OMNIX
OMNIX logoOMNIXEngineering & Safety
OMNIX Engineering and Safety Solutions

OMNIX

Engineering and Safety Solutions
Engineering Reliability. Ensuring Safety.
Industrial Engineering & Safety Consultancy

We work on the machines that stop your plant.

Scroll
01 · About OMNIX

The independent second opinion on the machines that stop your plant.

Independent field engineering and safety services for rotating machinery, steam systems and fire protection — one-off survey or annual contract, fixed-scope and fixed-price, quoted in writing before work begins.

Independent

No spares to sell and no machine builder to represent. When we say a bearing is failing or a trap is passing, there is no margin behind the recommendation.

Measured

Condition is recorded as numbers against a baseline, and loss is converted into rupees — so the decision reaches management as a figure, not an opinion.

Accountable

One engineer from walkthrough to report. The person who assesses your machine or premises is the person who signs the findings.

15Years of Indian Navy engineering behind every assessment
04Service lines — rotating, steam, fire, NDT
07Qualifications held by the engineer who signs the report
00Spares sold. No vendor margin behind a recommendation
01.1 · Why OMNIX exists

Two departments. One engineer.

Mechanical reliability and fire safety usually sit with two departments and two contractors. OMNIX puts both under one engineer — the founder, who does the work personally.

Indranil Chakrabarty, Founder & Director

Indranil Chakrabarty

Founder & Director

Fifteen years in the Indian Navy's Engineering Branch, serving on board ships and submarines as Mechanical Team Lead and Fire Safety In-Charge (NBCD In-Charge), and retired as Chief Engineering Mechanic.

Qualifications
  • Specialised Engineering Mechanic CourseNaval Engineering School, INS Shivaji
  • B.Tech, Mechanical Engineering
  • NEBOSH International General Certificate
  • PG Diploma, Fire & Safety EngineeringNIFSE
  • Diploma, Fire & Industrial SafetyAndhra University
  • NBCD In-Charge (Fire Safety In-Charge)Indian Navy
  • Advanced Industrial FirefightingIndian Navy
In the founder's words

“Fifteen years ago, on watch aboard an Indian Navy ship, a steam leak broke out in the engine room at the same moment a motor caught fire. The two belonged to different departments. Both were mine to handle before the next watch took over.

A pump quietly overheating and a fire system nobody has checked in months are not two separate risks. They live on the same ship, a few metres apart, and they get found the same way — too late, by whoever is standing closest.

That split — mechanical reliability handled by one department, fire safety by another, neither one seeing the whole ship — never made sense to me. I founded OMNIX to close that gap: not two contractors handing off, not two reports that never reference each other, but one engineer responsible for both across the same plant.”

The engineer who assesses your machine is the one who signs the report.— Indranil Chakrabarty, Founder & Director
Industrial centrifuge reliability service
S1 — ROTATING

Equipment Health Monitoring & AMC

CENTRIFUGES & SEPARATORS · COMPRESSORS · DIESEL GENERATORS · GEARBOXES · HVAC & REFRIGERATION
  • Condition monitoring — vibration, temperature and performance trended against a baseline set on the first visit
  • Centrifuges and separators — bowl, disc stack, drive, seals and separation quality, with overhaul supervision
  • Annual maintenance contract — scheduled rounds, one machine register, agreed call-out response
  • Failure investigation after seizure, carry-over or repeated tripping
As perIS/ISO 20816-3IS 4092IS 3703IS 3658
What you receive

A machine register with measured values and photographs, trend sheets against baseline, and a prioritised action list after every visit.

Steam system efficiency and trap management
S2 — STEAM

Steam Efficiency & Trap Management

BOILER HOUSE TO POINT OF USE · WHERE FUEL MONEY LEAKS OUT QUIETLY
  • Ultrasonic and thermal survey of every trap — passing, blocked, blowing through or healthy
  • Steam loss quantified in kg/hr and converted to annual fuel cost, trap by trap
  • Tagged trap register with condition, replacement priority and payback period
  • Insulation and condensate recovery advisory on the same visit
As perIS 15680
What you receive

A tagged trap register and a loss statement in rupees per year, so the repair decision reaches management as a number, not an opinion.

Fire safety compliance and supervision
S3 — FIRE

Fire Safety Supervision & Preparedness

OPERATIONAL FIRE SAFETY FOR UNITS WITH SYSTEMS ALREADY INSTALLED
  • Fire risk and gap assessment against the rules applicable to your occupancy
  • Monthly fire safety supervisor retainer — inspections, registers, corrective tracking
  • Mock drills, evacuation exercises and emergency response training
  • Fire alarm and detection system AMC — testing, logging, fault rectification
  • Permit-to-work system — hot work, height and confined space, built round your shift pattern with issuer training
As perIS 14489IS 2190IS 3844IS 2189IS 15105
What you receive

A gap register against the applicable rules, with corrective actions, owners and target dates — kept inspection-ready through the year.

Field NDT inspection — UT, MT, PT
S4 — NDT

NDT Inspection & Integrity Testing

PRESSURE VESSELS · STEAM HEADERS · WELD SEAMS · PIPING
  • Ultrasonic (UT) wall-thickness testing and corrosion mapping
  • Magnetic-particle (MT) crack detection on welds and structures
  • Dye-penetrant (PT) inspection for non-ferrous components
  • Same-day on-site report with photographic evidence and fitness-for-service commentary
As perIS 4260IS 3703IS 3658IS 822IS 2825
What you receive

A same-day report with UT, MT and PT readings, photographs and a fitness-for-service note against minimum wall thickness.

02 · Wing 01 · Engineering

Engineering Solutions.

Planned preventive, condition-based and predictive maintenance — condition measured, loss quantified, reported by an engineer with no spares to sell.

S1 · Monitoring

Equipment Health Monitoring

CBM · PdM · VIBRATION ANALYSIS · THERMOGRAPHY

Vibration evaluated as per IS/ISO 20816-3, with temperature and performance trended against a baseline set on the first visit — compressors, DG sets, gearboxes, HVAC and separators.

View details →
S1 · Separators

Centrifuges & Separators

PPM · CBM · OVERHAUL · DISC-STACK · DECANTER

Bowl, disc stack, drive and seals assessed as per IS 4092, vibration as per IS/ISO 20816-3, with overhaul supervision on any make — marine and industrial alike.

View details →
S1 · AMC

Annual Maintenance Contract

PPM · CBPM · MACHINE REGISTER · CALL-OUT

Scheduled rounds with vibration as per IS/ISO 20816-3 and centrifuges as per IS 4092, one machine register kept current, and an agreed call-out response.

View details →
S1 · Investigation

Failure Investigation

RCA · FMEA · 5-WHY · FAILURE MODE

After a seizure, carry-over or repeated tripping — vibration per IS/ISO 20816-3, cracks per IS 3703 and IS 3658 — what failed, why, and what must change.

View details →
S2 · Steam

Steam Efficiency & Trap Management

ULTRASONIC · THERMOGRAPHY · ENERGY LOSS · PAYBACK

Trap survey as per IS 15680 — ultrasonic and thermal — with the loss converted into an annual fuel cost and replacements ranked by payback period.

View details →
S4 · NDT

NDT Inspection & Integrity Testing

UT · MT · PT · SAME-DAY REPORT

UT as per IS 4260, MT as per IS 3703, PT as per IS 3658 and weld inspection as per IS 822, with a fitness-for-service note against IS 2825.

View details →
02.1 · Maintenance playbook

From planned preventive to predictive.

The maintenance strategies behind every engagement — chosen machine by machine, not applied by habit.

PPMPlanned Preventive Maintenance

Calendar- and running-hour tasks, scheduled before the machine asks for them.

CBMCondition-Based Maintenance

Intervene on measured condition — vibration readings judged against ISO 20816 severity zones — not on the calendar.

CBPMCondition-Based Preventive Maintenance

PPM intervals stretched or pulled in by what the condition trend actually shows.

PdMPredictive Maintenance

Trends against a first-visit baseline that flag a failure before it stops the plant.

RCMReliability-Centred Maintenance

The right strategy for each machine, ranked by how critical it is to production.

RCARoot Cause Analysis

5-Why and fishbone to the cause, not the symptom — so the fix holds.

FMEAFailure Mode & Effects Analysis

How each machine can fail, what that failure costs, and what prevents it.

MTBF·MTTRMean Time Between Failures · To Repair

Tracked in the machine register, so reliability is a number you can manage.

02.2 · Codes of practice

Checked against Indian Standards.

Testing, inspection and condition assessment carried out as per the relevant IS codes of practice. Which of them apply depends on your equipment and its duty.

IS/ISO 20816-3 : 2022Machine vibration — industrial machinery above 15 kW
IS 4092 : 2025Centrifuges — specification
IS 15680 : 2021Selection of steam traps
IS 4260 : 2004Ultrasonic testing of butt welds
IS 3703 : 2023Magnetic particle flaw detection
IS 3658 : 1999Liquid penetrant flaw detection
IS 822 : 1970Inspection of welds
IS 2825 : 1969Unfired pressure vessels — incl. Amdt. 5
03 · Wing 02 · Safety

Safety Solutions.

Operational fire safety for units with systems already installed — FRA, HIRA, PTW and ERP, with CAPA-tracked, inspection-ready registers.

03.1 · Safety playbook

From risk assessment to close-out.

The safety management methods behind every visit — applied to the systems and people you already have.

FRAFire Risk Assessment

Ignition sources, fuel loads and people at risk, audited by the IS 14489 method.

HIRAHazard Identification & Risk Assessment

Every hazard listed, rated for likelihood and severity, and given a control.

JSAJob Safety Analysis

The job broken into steps, the hazard in each, and the control before work starts.

PTWPermit to Work

Hot work, height and confined space authorised in writing, shift by shift.

SSOWSafe System of Work

The method, controls and sign-offs every permit rests on — written for your site.

ERPEmergency Response Plan

Who does what in the first five minutes — drilled until it is habit.

ITM·PPMInspection, Testing & Maintenance

Alarm, detection and fixed systems tested on a planned cycle and logged — checked against IS 2189 and IS 2190.

CAPACorrective & Preventive Action

Every finding given an owner, a target date and a documented close-out.

03.2 · Codes of practice

Checked against Indian Standards.

Inspection, testing and maintenance carried out as per the relevant IS codes of practice. Which of them apply to your premises depends on your occupancy.

IS 14489 : 2018Occupational health & safety audit
IS 2189 : 2026Fire detection & alarm systems
IS 2190 : 2024First-aid fire extinguishers
IS 15105 : 2021Automatic sprinkler systems
IS 3844 : 1989Internal hydrants & hose reels
IS 13039 : 2014External hydrant systems
IS 15908 : 2021Alarm control & indicating equipment
IS 15301 : 2003Fire fighting pumps
IS 15496 : 2004Gaseous extinguishing systems
IS 9457 : 2025Safety colours, signs & tags
IS 12349 : 1988Fire protection safety signs
IS 12407 : 1988Symbols for fire protection plans
04 · Our commitment

Why choose OMNIX.

Six principles that define every engagement — the same on a one-off survey as on an annual contract.

01

OEM-neutral independence

We hold no service agreements with any equipment manufacturer. Every assessment serves machine condition and your interest — never a vendor obligation.

02

Navy-grade technical authority

Fifteen years maintaining rotating machinery and steam plant in the Indian Navy. The engineer who assesses your machine is the one who signs the report.

03

Quantified reporting

Findings reported as measured values and, where it applies, a rupee figure — steam loss per year, condition against baseline, risk in plain terms.

04

Local presence

Based in Visakhapatnam. Travel is included within city limits and quoted in advance for outstation sites. No fly-in cost.

05

Inspection-ready documentation

Gap registers, corrective actions with owners and target dates, and logs kept current through the year — ready when an inspection comes.

06

Hands-on in the field

Not advisory from a desk. We strip the bowl, scan the wall, tag the trap and run the drill — then document the result.

05 · How it works

Four steps. No lock-in.

From a free walkthrough to a written report you own — with no retainer and no minimum term.

STEP 01

Site call

A thirty-minute walkthrough at your plant, at no charge. If we cannot add anything, we say so.

STEP 02

Fixed-scope job

One survey or assessment at a price agreed in writing. No retainer, no lock-in, no minimum term.

STEP 03

Written report

Within five working days. Measured values, what the condition is costing you, prioritised actions.

STEP 04

You decide

Act in-house, hand it to your OEM, or bring us back. The report is yours either way.

Book a site walkthrough

No charge, no obligation.

Tell us your unit name, location and the equipment or premises concerned. A thirty-minute walkthrough at your plant — travel included within Visakhapatnam city limits, quoted in advance for outstation sites.

NDA signed on request before the first visit.